Legrand Inform PDSP – 33080 80kVA / 64kW 3Phase in/3Phase Out Online Double Conversation UPS with (12V.40Ah.) x 62 battery bank

Sale!

$32,142.00

Add to Wishlist
Add to Wishlist
Compare
SKU: PDSP - 33080-1 Category:

Description

Pyramid DSP
3 Phase In – 3 Phase Out / 10 – 120kVA

– IGBT Rectifier
– Real Digital Signal Processor (DSP) controlled transformerless design
– Input Power Factor Correction PFC (PF: >0.99)
– Low Total Harmonic Distortion Level (THDi ≤ 4%)
– High Efficiency (up to 94%)
– Wide Input Voltage Range
– Generator Compatible Operation
– Evolution and redundancy guaranteed by on site
– Modular Parallel Systems
– Intelligent battery management system extends the lifetime of batteries
– Static and Manual Bypass
– Optional Galvanic isolation transformer
– Communication with computers and network systems with SNMP availability
– Expandable battery blocks
– Low installation and operating costs
– Different voltage applications with refer to country mains characteristic;
PDSP version for 380/400/415V(Ph_Ph) applications
PDSP-U version for 200/208/220V(Ph_Ph) applications
Special voltage applications other than stated values
– EPO (Emergency Power Off)

* 3 phase in 1 phase out version is available (10 to 40 kVA) (380-400-415V version)
* 50/60 Hz Frequency Converter version is available